Jiangsu XinLingYu Intelligent Technology Co., Ltd.

Innovation seeks development and cooperation wins the future

Manufacturer from China
Verified Supplier
7 Years
Home / Products / Hot Dip Galvanizing Equipment /

Automatic Hot Dip Galvanizing Equipment For Pipes / Tubes

China Automatic Hot Dip Galvanizing Equipment For Pipes / Tubes wholesale
  • China Automatic Hot Dip Galvanizing Equipment For Pipes / Tubes wholesale
  • China Automatic Hot Dip Galvanizing Equipment For Pipes / Tubes wholesale

Automatic Hot Dip Galvanizing Equipment For Pipes / Tubes

Ask Latest Price
Brand Name :Xinlingyu
Certification :IS09001:2015 , ISO 45001:2018
Place of Origin :China
MOQ :1 set
Price :negotiation
Payment Terms :L/C, T/T
Delivery Time :90 days
Packaging Details :standard export packing
Condition :New
Product name :Hot dip galvanizing plant/zinc plating equipment,Galvanizing wire production line,Hot dip galvanizing production line
Usage :steel wire hot-dip galvanizing,Hot dip Galvanizing steel&iron wire
Material :steel/aluminum,galvanized Pipe
Color :Customized Color
Control :Automatic
Contact Now

Add to Cart

Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
View Product Description

Automatic Hot Dip Galvanizing Equipment For Pipes / Tubes

Introduction:
Hot dip galvanizing is an efficient method to keep the metal from corrosion, the products widely used on steel structure facility in different industries. Put the rust removed steel parts into 450℃ melt zinc liquid kettle, make the zinc adhere on the surface of the steel part to realize metal anti-corrosion.

Wanxin company can offer Steel Pipe Automatic Galvanizing Equipment and General Hanging Galvanizing Equipment and “Turn-key” engineering service. The steel pipe full automatic galvanizing equipment can galvanize steel pipe outer diameter from 1/2 inch to 8 inch, section steel hanging galvanizing equipment can galvanize steel products such as light pole, cable tray, highway guardrail, angle steel, H beam, channel steel, the equipment size can be customized.

Now Wanxin company can develop ceramic zinc kettle and heating combinative system, which can process small pieces like bolts and nuts, under 530℃, by using electricity as heating medium.

The zinc kettle includes general steel kettle and ceramic kettle, combustion system includes auto-manual combined gas control system, and international advanced special heating rods electricity heating system.
  • Main Technical specification
  • Applicable pipe size

  • Nominal bore: Min. 1/2” – Max. 6”
  • Wall thickness: Min. 1.5mm – Max. 4.5 mm
  • Pipe length:5-6m(1/2,3/4) 4-6m(1-6)
Nominal Size Weight of Pipe Production Capacity
In kg/m Kg/6.0m pcs./hr.approx. kgs/hr.approx.
1/2″ 1.22 7.32 1776 13000
3/4″ 1.58 9.48 1688 16000
1″ 2.44 4.64 1092 16000
1-1/4″ 3.14 18.84 850 16000
1-1/2″ 3.61 21.65 522 16000
2″ 5.1 30.6 260 16000
3″ 6.51 39.06 410 16000
4″ 12.1 72.6 220 16000
5” 15.03 90.2 178 16000
6” 17.82 106.9 150 16000

Note :

(1) The Capacity is limited within 16000 kg/hr which is based on heating capacity of the kettle.

(2) Tube length is 6m.

(3) Above figures are based upon 100% working efficiency.

Some kinds of squire and rectangular pipes can be treated by this line. But the line should be restricted within 2 pipes , the ratio of long and short side should be restricted within 1.5 and the min. bore dimension of pipe must be larger than 25mm.

square pipe 20*20mm;25*25mm;30*30mm;40*40mm,50*50mm;60*60mm;75*75mm;80*80mm;90*90mm;100*100mm;120*120mm;127*127mm

rectangular pipe

13*26mm;20*40mm;25*50mm;30*60mm;40*80mm;50*100mm;60*120mm;70*140mm;80*160mm;50.8*101.6mm

  • Galvanizing Method

Dry type galvanizing system;

Pipe OD under 1-1/2”(including 1-1/2”) are processed with quadruple line way;

Pipe OD 2”-4” (including 4”) are processed with double line way.

Pipe OD 5”and 6” are processed with single line way.

  • Wiping of excess zinc

Outside of pipe: By Compressed Air with outer blowing

Inside of pipe: Pipe OD 1/2”and 3/4” By Over-heated Steam inner blowing nozzle.

For pipe’s OD above 1”(including 1”) lancer plug inner blowing technique is adopted for improving the inner coating quality ,saving steam consumption and lessening the generation of zinc powder .

  • Product Usage
  • For gas and water service
  • For general structure purpose
  • Standard

B.S 1387 Light and Medium Series, DIN 2441 etc.

  • Unit

The metric system of measurement shall be applied.

  • Electrical System

Power Supply: By City Supply

Primary Source: 380V±5%, 50HZ , 3 phase ,Control Circuit Source: 220V ,50HZ , Single phase ,24V D,C,

Transformer for control circuit and solenoid coil shall be prepared by the seller.

General Capacity: abt. 260KW (Whole plant ; including auxiliary Equipment )

  • Compressed air

Pressure: 0.6Mpa (min. 0.5Mpa at the utility point)

Consumption: 30Nm3/h

  • Fuel: natural gas

Consumption: at full capacity: approx. 1,900,000 Kcal/hr

Natural gas 230Nm3/hr(combustion value of natural gas:8500Kcal/litre)

At idle operation: approx. 200,000 Kcal/hr

Natural gas:24nm3/hr

The pressure of gas before burners: max. 0.4Mpa

  • Steam (over-heated or dry steam)

Pressure: 1.25Mpa (Min. 1.0Mpa at utility point)

Temperature: 275°C

  • Zinc coating: approx. 500 g/m2 ,.By shortening dipping time the zinc coating can be reduced around 300 g/m2
  • Ambient temperature : Not less than 10°C
  • Production process:

The steel pipes are successively acid pickled, double flux coating and dried. And then dried pipes are immersed into zinc bath by dipping star wheel.

Production flow chart from black steel pipe to galvanized pipe is as follows: (Black steel pipe)

  • Production Capacity (Example)

The following table shows examples of the production rates for each size of B.S. Medium pipes, under the favorable conditions.

(4) Dipping time is a very big factor of the production rate when heavy coating is required. Dipping time to get necessary coating weight varies mainly according to the chemical composition of the pipes when operating conditions are the same. Production rate of those pipes which need longer dipping time will become lower.

(5) Straightness The bending of pipes shall be small as much as possible. Pipes with big bending can not be processed smoothly in this plant.

It is recommended that the bending of pipes should be less than 5mm/6m.

  • Scope of supply
  • Pre-treatment Equipment (batch cleaning system)

A bundle of pipes weighting usually about 3 tons is successively cleaned

in the acid pickling,1st fluxing and 2nd fluxing tanks by using over head travel crane.

No water rinsing technology is adopted for saving water consumption and easing the environment pollution.

After pickling the pipes are dipped in 1st fluxing tank (dirty) and then dipped into 2nd fluxing tank(clean). The fluxing solution of 1st and 2nd fluxing tank are connected together becoming a circulating treatment system. The flow rate of circulating system is 3 m3/h.The FeCl2 content in 1st fluxing tank will be controlled around 10g per litter and the FeCl2 content of solution after regenerating treatment will be controlled below 0.5g per litter. This clean solution will be pumped into 2nd fluxing tank (clean) and the FeCl2 content in 2nd fluxing tank will be controlled with 1g per litter. The solution will be pumped continuously into 1st fluxing tank (dirty) and then pumped to regeneration station. So that after 2nd fluxing the solution sticking to pipe’s surface will be very clean. Zinc dregs generating in kettle and zinc consumption will be reduced.

It’s recommended do not use degreasing procedure in this system by using no oil pipe’s ERW line. Other wise you have to adopt measure for treating waste degreasing solution and rinsing water.

The pretreatment equipment consists of following items

  • Six sets of acid pickling tank (Drawing supply)

Dimensions : 8000(L)×1600(D)×1500(W) mm

Material : Glass fiber with mild steel structure.

  • Two set of Fluxing Tank (Drawing supply)
  • Flatcar for carrying pipes bundle into/out enclosed room surrounding pretreatment area. 2 sets
  • Enclosed room surrounding pretreatment area. 30mX12mX7m
  • Drying furnace

After being fluxed, the pipes are transported and dried in the drying furnace which is heated by exhaust gas of the galvanizing furnace. It consists of the following items:

  • One set of the feeding table.

Material: steel structure

  • One set of transmitting chain device
  • Three transmitting chains

(2) One set of drive unit with gear-motor 4KW,which runs step-by-step.

  • Drying furnace

(1) Furnace (with cast iron heat radiation plates) Dimensions : 8500(L)×9124(W) mm

(2) One set of steel pipe heat-exchanger for hot air blowing dry system.

(3) One set of stainless steel heat exchanger for hot compressed air used by inner blowing.

(4) One set of hearth covering plate (steel structure with heat-insulation material)

(5) One set of hot air circulating and blowing system

Hot air circulating fan capacity: 6660 NM3/hr

Temperature: abt. 150°C

Note: concrete foundation, red bricks and labor force are of buyer’ supply. 1 engineer and 3 skill workers will work for furnace construction on site.

  • Galvanizing Equipment

The pre-treated and dried pipes roll down from drying furnace two by two(or four) and get into the pocket space of the dipping star wheel.

As the dipping star wheel rotate step by step, the pipes are immerged into the zinc bath (zinc bath temperature shall be 445°C- 455°C) and finally rotate to the outlet position .Then the pipes are kicked off by a pneumatic device and fall down onto the receiving racks which are installed in the kettle. Then the pipe lifting hook activates and a press plate mounted on hook presses down at the same time. With this function four pipes will be orderly distributed on receiving edge of hook and avoiding pipes to be engaged together. Then pipe(s) will be lifted by the lifting hooks and properly go through the separating plate and attached to grooves of the magnetic rollers, which are set above the zinc bath.

As the magnetic rollers are driven by a frequency conversion motor ,pipe is withdrawn up by rollers from the kettle. On the way of the withdrawing unit, the excess zinc of the outside of the pipe is wiped off by the outer-blowing device with compressed-air, for getting better wiping effect, different size of blowing nozzles are used to match different size of pipes and the pressure of blowing compress air can be adjusted by a pressure adjust valve.

When pipe reaches the top of the withdrawing rollers it is shifted to the inner-blowing station by step-walk beam. The excess zinc of the inside of the pipe is wiped off by Explosion-blowing with over-heated steam (1/2”and 3/4”) or long lancer plug with hot compressed air. Long lancer plug inner blowing method is better than nozzle method which can save steam consumption, improving quality of inner blowing and reduce generating quantity of zinc powder. But for small pipes (1//2 or 3/4”) if the pipe’s inner bore without getting deburring treatment or the weld bur is not controlled well. The long lance plug inner blowing will become very difficult. And customer can choice one according to your condition.

After inner blowing, the pipe is transferred to a cradle beam and then transferred into the quenching tank.

The system consists of following items :

  • Galvanizing Furnace

(1) Galvanizing furnace

(2) Auxiliary devices for galvanizing furnace.

Note: The concrete foundation, red bricks and labor force are of buyer’s supply, 1 engineer and 3 skill workers will work for furnace construction on site.

  • One Galvanizing kettle

Dimension : 1800(W)×2910(D)×8000(L)×60(T) mm (inside effective dimens.)

Weight:37 tons .

Body material: low carbon low silicon steel (Chinese steel special for galvanizing).

Upper part with welded flat steel frame. Round corners

Ultrasonically tested, free of inclusion, impurities, blowhole etc.

  • Automatic combustion System

(1) 6 Pulse Burners And Auxiliary Devices for automatic combustion

(2) Two sets of Hot Flame recirculation fans

Capacity : 27648 NM3/hr

Motor : 7.5KW

Pressure : 96 mm(H20), 20°C

Working temperature : 500~800°C

(the material for propeller is hi-temperature alloy)

If temperature of flame is lower than 500°C the fans must work in low speed to avoid motor from over load.

(3) Two sets of installation base frame for fixing burners and recirculation fan.

Material : Steel structure

(4) Combustion air fan

Capacity : 4500 NM3/hour

Motor : 18.5 KW/2p

Pressure : 9000 mm(H20), 20°C

(5) Automatic igniting and flameout monitoring system.

(6) Two thermo-couples installed in kettle for monitoring temperature of zinc melt in the kettle and two others installed in the furnace for monitoring the temperature of flame in the furnace hearth.

Material : Mild steel, Casing bag : Tetron needle felt

pressure difference monitoring .

  • Suction fan
  • Capacity: 43000 NM3, Pressure: 200 mm (H2O), N=27KW
  • Duct system
  • Auxiliary Equipment
  • Two sets of zinc pump
  • Motor: 5.5 KW
  • One set of zinc dregs grab bucket
  • Extraction System For Waste Fume Of Galvanizing Furnace

(1) Duct: Material: Steel structure

(2) Chimney Material: Steel structure

(3) Fan

Capacity: 3160 NM3/hr

Pressure: 106 mm(H2O)

Motor: 2.2 KW

  • Electrical control system

The galvanizing plant shall be designed to make automatic control. The system consists of the followings:

  • 3 sets of power supply panel.
  • One set of main P.L.C. control panel
  • One set of main control desk
  • One set of control stall for post-treatment section

(1) steam Boiler 1 se

Capacity: 3 tons/hour

Pressure: 1.25Mpa

Temperature 275oC

(2) Air compressor 4 sets

Q=13.3Nm3/min

P=0.8Mpa

N=75Kw

  • Remarks for the technical proposal
  • All electrical components and motors are Schneider brand;

Automatic Hot Dip Galvanizing Equipment For Pipes / Tubes

China Automatic Hot Dip Galvanizing Equipment For Pipes / Tubes for sale

Automatic Hot Dip Galvanizing Equipment For Pipes / Tubes

Inquiry Cart 0