
Add to Cart
Customized xly Reasonable Crane For Hot Dip Galvanzing Crane
High quality service:
Item | Professional Service |
1 | Provide OEM/ODM service |
2 | Provide professional plastic mould design and manufacturing serivce |
3 | Provide plastic parts moulding/ printing/ painting service |
4 | Provide plastic parts assembly service |
5 | Provide plastic parts package service |
6 | Provide After-Sales service |
we are a powerful supplier who have joined the Trade Assurance to protect your payment to make sure that we deliver on time and manufacture quanlity products as required.
Note:
1. above sizes are standard sizes.
2. customized sizes are available.
3. price without ventilation system, draught fan and tube sizes depend on laboratory layout on site.
We will offer basic layout and electrical system diagram of production line within 30 days after signing the contact.
We will supply all information when delivery ,including line electrical drawing,original manual of equipment and instrument table,equipment conformity certificates,list of spare parts,equipement maintanance procedures,drawing and suppliers of quick-wear pats.
Normal packaging:
Other packing can be customized according to customer's requirement
The designing of this production line takes ETP, energy saving, less labor and low cost as top priority. The line includes transportation system, auto acid washing system, acid smoke collection system, auto flux heating system, flux online reproduce treatment system, G.I tank auto heating control system, zinc smoke collection system and basic technical device system.
Transportation system: by means of lifting hanging unit, hanging unit moving dolly, moving dolly and crane to achieve longitudinal and radial transportation of hanging pieces.
The material transfer system is designed to make the whole hot galvanizing line of black material and white material more smooth, in order to achieve high efficiency and high productivity. The main components of the material transmission system include a single beam crane, an electric rail flat car, a steel shifting machine, a rail and a sliding contact line.
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 25-40 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=3000USD, 100% in advance. Payment>=3000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below :